About Saltbush
Saltbush Renewables is an Adelaide-based developer of utility-scale solar, wind and co-located battery storage in South Australia and western Victoria. It takes projects from site origination through land, approvals and grid connection to financial close, then manages construction and hands each project to its owner-operator. It was established in 2026 and begins operating in January 2027, with five projects totalling 1,510 MW in its opening pipeline.
About the role
The Lead Electrical Engineer sets the technical design basis for every Saltbush project and leads the Grid and Engineering team. The role owns concept electrical design, technology selection and design review, and signs off the technical content of each gate paper. It exists because buyers, lenders and network providers rely on the engineering being sound before they rely on anything else.
Terms
Full-time, permanent. Adelaide CBD, hybrid (three days a week in the office), with field travel to the Mid North, Limestone Coast and western Victoria. Reports to the Chief Development Officer.
Remuneration
A$170,000 to A$195,000 plus 12 per cent superannuation. Industrial instrument: Professional Employees Award 2020 (MA000065), Professional Engineer Level 4; award-free under a guarantee of annual earnings where earnings exceed the high income threshold.
What you will do
1. Lead the Grid and Engineering team and set its priorities, standards and hiring needs.
2. Define the electrical design basis for solar, wind and battery projects, including voltage levels, collector systems, substation arrangement and battery configuration.
3. Prepare and review single-line diagrams, protection and control philosophies, earthing studies and lightning protection concepts.
4. Select and compare technology options (modules, trackers, inverters, turbines, battery systems, grid-forming capability) on cost, performance and bankability.
5. Review the work of the Grid Connection Engineer and consultants, and own the technical risk register.
6. Set and maintain the standards schedule (AS 2067, AS/NZS 3000, AS/NZS 7000, AS/NZS 5033, IEC 62933, IEC 61400 series) for each project.
7. Prepare capital and operating cost estimates for each gate and reconcile them with market pricing from the Procurement Officer.
8. Prepare the technical scope and review designs for EPC tender documents, as owner's engineer for the owner-operator.
9. Lead design reviews at concept, 30, 60 and 100 per cent stages, and witness factory and site acceptance tests.
10. Support lender and owner-operator technical due diligence, including meetings with the independent engineer.
What you bring (essential)
1. A degree in electrical engineering.
2. At least ten years in high-voltage electrical design or delivery, including at least five on utility-scale generation or storage.
3. Design experience on two or more renewable projects connected at 132 kV or above.
4. Strong knowledge of AS 2067, AS/NZS 7000 and protection and control design.
5. Chartered or registered engineer status (Engineers Australia CPEng; registration under the Professional Engineers Registration Act 2019 (Vic) where services are provided in Victoria).
6. Experience managing and developing a team of engineers.
7. Ability to write a technical position for non-engineers and defend it to a network provider.
8. A current driver's licence and willingness to visit sites in remote areas.
Desirable
1. Experience on battery projects with grid-forming inverters.
2. Experience as owner's engineer or lender's technical adviser.
3. Experience with wind turbine electrical systems and transmission line design.
4. Knowledge of the ElectraNet and AusNet technical requirements.
5. A postgraduate qualification in power systems or engineering management.
Your first 90 days
Days 1 to 30: Review technical files for the five projects. Issue the design basis and standards schedule. Set up the Grid and Engineering team's routine and review process.
Days 31 to 60: Issue concept electrical designs for Burra Creek and Penola. Specify the technology comparison for Minyip. Agree the hiring plan for the next four engineering roles.
Days 61 to 90: Present the first cost estimates at gate review. Run the first design review. Issue the technical risk register to the Investment Committee.
How success is measured
1. Every gate paper carries a signed technical section, and no gate decision is reversed for a technical error.
2. Capital cost estimates are within 10 per cent of EPC tender prices at Gate 6.
3. The Grid and Engineering team is at its planned headcount by the end of each quarter, with no vacancy on a critical-path role longer than 12 weeks.
Screening questions
1. Describe a substation layout you designed for a renewable project. What did you change after the network provider's review?
2. How would you set the DC to AC ratio and battery size for a 300 MWac solar project, and what do you need to know to do it?
3. What are the protection risks of connecting a grid-forming battery to a weak part of the network?
4. How do you decide whether to build the connection works ourselves or leave them with the network provider?
5. Tell us about a design error found late in a project. How was it found, and what did it cost?
How to apply
Email careers@saltbushrenewables.com with your resume and a short note on what you want to own here, quoting the role title. Answer the screening questions in your note. We read every application and reply to all of them.
